Building placement system
Σύστημα δόμησης
Last updated
The way the building is placed in relation to the boundaries of the plot: continuous, detached or mixed. It is set by the building terms of the area.
What it means in practice
The building placement system (σύστημα δόμησης) answers the question of where the building stands within the plot in relation to its boundaries. There are three systems:
- the continuous system, where the building adjoins the side boundaries of the plot and forms a continuous frontage with the neighbouring buildings,
- the detached system, where the building stands clear of all the boundaries of the plot,
- the mixed system, which combines elements of the two.
Where the building does not adjoin a boundary, it keeps a minimum distance from it, the boundary distance Δ. The building placement system therefore directly affects the position and outline of the building and, together with site coverage, how much of the plot stays open.
The building placement system is set by the building terms of the area. Different systems may apply in different areas or city blocks of the same town.
Common mistakes
- Applying the system of the neighbouring buildings without checking the building terms that apply at that particular location.
- Leaving out the boundary distance Δ from the boundaries the building does not adjoin.
- Confusing the building placement system with site coverage: the first sets the position of the building, the second its maximum footprint.
Difference from the building line
The building line sets how far the plot may be built towards the public common space, usually the street. The building placement system sets how the building is placed in relation to the boundaries of the plot. The two are checked together to arrive at the position of the building.
Questions
Which building placement systems are there?
The continuous system, where the building adjoins the side boundaries of the plot, the detached system, where it stands clear of all the boundaries, and the mixed system.
Where do I find which building placement system applies to a plot?
In the building terms that apply at the plot's location. The competent Building Service (ΥΔΟΜ) can certify them for you.
Can I choose the building placement system?
The building placement system is set by the building terms of the area. Whether and when a departure from it is allowed is set by the provisions in force and is checked for each plot.
Ask about your own property
Ask using the address or the ΚΑΕΚ (Cadastre property code) and get the article with its ΦΕΚ (Government Gazette issue).
An information tool, not legal advice. Professional responsibility remains with the engineer.