Skip to content
Building terms

Detached building system

Πανταχόθεν ελεύθερο σύστημα

Last updated

A building placement system where the building stands clear of all the boundaries of the plot. It is often confused with the continuous system, where the building adjoins the side boundaries of the plot.

What it means in practice

In the detached system (πανταχόθεν ελεύθερο σύστημα), the building stands within the plot without touching any of its boundaries. Open space remains around it on all sides, separating it from the neighbouring plots and their buildings.

The building keeps a minimum distance from the boundaries with neighbouring properties, the boundary distance Δ, under the provisions in force. Towards the public common space, its position is also set by the building line. These distances, together with site coverage, limit the outline within which the building can be placed. On small or narrow plots, this limit may be the one that finally sets the size of the building.

Whether the detached system applies to a plot follows from the building terms of the area.

Common mistakes

  • Placing the building without checking the boundary distance Δ from each boundary it does not adjoin.
  • Drawing the outline on the basis of site coverage alone, without the distances from the boundaries.
  • Leaving out the check for projections, such as balconies, within the distances from the boundaries.

Difference from the continuous building system

In the continuous system, the building adjoins the side boundaries of the plot and forms a continuous frontage with the neighbouring buildings. In the detached system, it stands clear of all the boundaries. Which system applies is set by the building terms of the area and is checked before every design.

Questions

What does the detached building system mean?

That the building does not adjoin any boundary of the plot but stands clear of all of them. The minimum distances from the boundaries are set by the provisions in force.

How far must the building stand from the boundaries?

The minimum distance of the building from the boundaries it does not adjoin is the boundary distance Δ. The way it is calculated is set by the provisions in force and is checked for each design.

Ask about your own property

Ask using the address or the ΚΑΕΚ (Cadastre property code) and get the article with its ΦΕΚ (Government Gazette issue).

An information tool, not legal advice. Professional responsibility remains with the engineer.

Back to the glossary