Final ground level

Οριστική στάθμη εδάφους

Last updated

The ground level after the excavations and fills of the design, from which heights are measured. It is often confused with the natural ground, that is, the level before any intervention.

What it means in practice

The final ground level (οριστική στάθμη εδάφους) is the ground as it will be shaped after construction, according to the design. It follows from the natural ground, once the excavations, where soil is removed, and the fills, where soil is added, are taken into account.

It is the reference point for many checks of the building terms. The height of the building is measured from it and the maximum permitted height is checked against it. The volume for the volume coefficient is measured above it. Whether a floor is a basement is judged in relation to it.

On a level plot the final ground level may be almost the same as the natural ground. On a sloping plot, the shaping of the ground and the points from which heights are measured need more care.

Common mistakes

  • Measuring heights from the natural ground instead of the final ground level.
  • Fills beyond the limits of the provisions in force, to change the classification of a floor or the measured height.
  • A difference between the ground shaping of the design and the shaping finally carried out on site.

Difference from the natural ground

The natural ground is the level before any intervention, as recorded on the topographic survey plan. The final ground level is the level after the excavations and fills of the design. The natural ground is the starting point; the final ground level is the one from which heights are measured.

Questions

Where is the height of a building measured from?

Heights are measured from the final ground level, as it follows from the design after the excavations and fills. The exact method of measurement, for example on a sloping plot, is set by the provisions in force.

Can I raise the final ground level with fills as much as I like?

No. The provisions in force set limits on fills and excavations relative to the natural ground, which are checked in the design.

Related guides

Ask about your own property

Ask using the address or the ΚΑΕΚ (Cadastre property code) and get the article with its ΦΕΚ (Government Gazette issue).

An information tool, not legal advice. Professional responsibility remains with the engineer.

Back to the glossary