Skip to content
Buildings

Natural ground level

Φυσικό έδαφος

Last updated

The ground level before any intervention. It is often confused with the final ground level, which results from the excavations and fills of the design.

What it means in practice

The natural ground level (φυσικό έδαφος) is the ground of the property as it is before any intervention, that is, before excavations, fills or constructions. An engineer records it on the topographic survey plan, usually with spot levels and contour lines, so that the relief of the plot is visible.

The natural ground level is the starting point of the design. The excavations and fills are designed on it, and the final ground level follows from it. The difference between the two shows how much the design changes the ground, and the provisions in force set limits on that change.

On a level plot the natural ground level is easy to describe. On a sloping plot, or on a plot where earlier interventions have taken place, determining it needs care and documentation.

Common mistakes

  • Taking a level already changed by earlier fills or excavations as the natural ground level, without documentation.
  • Recording the levels incompletely on the topographic survey plan, especially on a sloping plot.
  • Measuring the heights of the building from the natural ground level instead of the final ground level.

Difference from the final ground level

The natural ground level is the level before any intervention. The final ground level is the level after the excavations and fills of the design, and heights are measured from it. The first describes the property as it is; the second, as it will be after construction.

Questions

Where is the natural ground level of a plot shown?

On the topographic survey plan, which records the relief of the property before construction, usually with spot levels and contour lines.

Why does the natural ground level matter, if heights are measured from the final ground level?

Because the final ground level follows from the natural ground level, and the excavations and fills of the design are checked against it, within the limits of the provisions in force.

Related guides

Ask about your own property

Ask using the address or the ΚΑΕΚ (Cadastre property code) and get the article with its ΦΕΚ (Government Gazette issue).

An information tool, not legal advice. Professional responsibility remains with the engineer.

Back to the glossary