Skip to content
Permits and files

Building permit file: the documents and the articles that require them

Updated

Short answer

The building permit file is set today by Article 326 of the Spatial and Urban Planning Code (Law 5306/2026), ΦΕΚ (Government Gazette) Α΄ 88/08.06.2026, whose par. 1 lists the supporting documents and studies, from the owner's application to the form for the parking-space buy-out contribution. Par. 1 of Article 326 codifies par. 1 of Article 40 of Law 4495/2017, which was repealed by Article 477 of the Code.

What applies today

Provision
Article 326 of the Spatial and Urban Planning Code (Law 5306/2026)
Last amended by
Not amended
Last checked

The building permit file is set today by Article 326 of the Spatial and Urban Planning Code (Law 5306/2026, ΦΕΚ (Government Gazette) Α΄ 88/08.06.2026), whose par. 1 lists the supporting documents and studies, from the owner’s application to the form for the parking-space buy-out contribution. Par. 1 of Article 326 codifies par. 1 of Article 40 of Law 4495/2017 (ΦΕΚ Α΄ 167/03.11.2017), which was repealed when the Code took effect. This page is a translation of the Greek guide; the Greek text of the ΦΕΚ is the one that applies.

Which provision applies on 09.11.2026

Article 326 of the Code applies, in force since the Code’s publication (Article second of Law 5306/2026), no longer Article 40 of Law 4495/2017.

Article 477 of the Code provides that, from the day the Code takes effect, the codified provisions listed in Annex Α΄ are repealed. In Annex Α΄ of the Code, par. 1 of Article 326 corresponds to par. 1 of Article 40 of Law 4495/2017.

Under par. 4 of Article 326, a decision of the Minister of Environment and Energy may set supporting documents and more specific matters concerning the procedure for the approvals of that Article. Under Article 319 par. 1 case α΄ of the Code, the procedure for submitting the documents electronically is set by a decision of the Minister of Environment and Energy.

Article 322 par. 3 of the Code, which codifies par. 3 of Article 55 of Law 4759/2020, is tied to the modification of the «e-Άδειες» system (for its adaptation, par. 2 provides for declaratory acts of the President of ΤΕΕ, the Technical Chamber of Greece). It provides that preliminary approvals and building permits in the course of being issued on the date the system is modified are completed under the provisions in force when they were submitted. Its second sentence adds that building permits following a preliminary approval issued under the earlier provisions may be issued under the new provisions, after the preliminary approval is revised.

We found no amendment of Article 326 in any ΦΕΚ Α΄ issue from 89/2026 to 181/05.11.2026, the latest series Α΄ issue published on 09.11.2026.

The basic documents of every application

Administrative items (Article 326 par. 1):

  • Application of the owner or of the person holding a lawful right, with the declarations of assignment and undertaking of the studies (case α΄).
  • Title deeds, a recent ownership certificate or cadastral sheet, and an extract of the cadastral diagram for each property (case γ΄).
  • Proof of legality of any existing buildings (case δ΄).
  • Topographic survey plan tied to the state coordinate system, which has received an electronic diagram code from the Hellenic Cadastre (case ιθ΄).
  • Coverage diagram (case κ΄). The specifications of the survey plan and the coverage diagram are set by Article 325 of the Code.
  • Health and safety plan and file, where required under Presidential Decree 305/1996 (case ιγ΄).
  • Waste management data (Σ.Δ.Α.), with the contract of the manager of excavation, construction and demolition waste (Α.Ε.Κ.Κ.) with an approved Σ.Ε.Δ., or the Ε.Ο.ΑΝ. decision approving an Α.Σ.Ε.Δ. For regional units without an approved Σ.Σ.Ε.Δ. for Α.Ε.Κ.Κ., a solemn declaration of the manager (case ιδ΄).
  • Notarial declaration of parking spaces and the certificate of its transcription or registration; in a buy-out, proof of payment of the contribution and the contribution form (cases ιε΄ and κα΄). Case ιε΄ exempts the public properties of the structures and services of Law 4662/2020 from the notarial declaration and the certificate.
  • Explanatory report of par. 1 of Article 3 of Law 1577/1985 (case ιστ΄).
  • Proof of contributions to the State, e-ΕΦΚΑ and the municipality (case ιζ΄).
  • Receipt or invoice for the designers’ fees and for the Engineers’ Income Tax (case ιη΄).

The studies by discipline

The studies are set in cases ε΄ to ιβ΄ of Article 326 par. 1:

  • Architectural study, which contains the passive fire protection study and the accessibility study for persons with disabilities, where required (case ε΄).
  • Structural study (case στ΄).
  • Studies of electromechanical installations (case ζ΄).
  • Building energy performance study (case η΄).
  • Works time schedule study (case θ΄).
  • Study of plumbing and drainage installations (case ι΄).
  • Active fire protection study, drawn up on the basis of the passive fire protection study, where required (case ια΄).
  • Fuel gas study, approved by the competent gas supply company (case ιβ΄).

Approvals from other bodies

Article 326 asks for the approvals of other services and administrative bodies, where required (case β΄), without listing them. Whether each one is required is set by other provisions of the Code or by other legislation.

  • Certificate of the Building Service. For permits of categories 1, 2 and 3 without a preliminary approval, a written certificate of the Building Service is submitted, stating the building terms and the approvals of bodies and services needed in the case (Article 324 par. 2 case β΄ sub-cases βα΄ and ββ΄ of the Code). It must be accompanied by a solemn declaration of the designing engineer, under Article 8 of Law 1599/1986, that the building terms and conditions have not changed.
  • Architecture Council (Σ.Α.). Article 464 par. 2 of the Code makes the Σ.Α. competent to give a concurring opinion on architectural studies in the cases it lists.
  • Archaeological sites and protected zones. Article 322 par. 1 case α΄ sub-case αζ΄ of the Code places in Category 1 the erection of, or addition to, buildings on plots inside protected areas of Article 19 of Law 1650/1986 or zones such as archaeological sites, historic sites, traditional settlements or traditional parts of towns. The provision sets the way the permit is issued. In traditional parts of towns, traditional settlements, historic sites, archaeological sites and areas of outstanding natural beauty, the Σ.Α. gives a concurring opinion on every building work, with the exceptions of the same case (Article 464 par. 2 case α΄). Where an archaeological approval is required by other legislation, it is submitted under case β΄ of Article 326 par. 1.
  • Forest legislation. Under Article 314 case γ΄ of the Code, the decision approving an intervention under Law 998/1979 also counts as a preliminary approval.
  • Fire protection. The fire protection studies are part of the file (cases ε΄ and ια΄). A separate approval of the Fire Service, where other legislation requires it, is submitted under case β΄.
  • Change of use to residence of lawfully existing buildings outside the plan and outside settlement boundaries. Par. 3Α of Article 199 of the Code, added by Law 5322/2026 (ΦΕΚ Α΄ 117/24.07.2026), concerns lawfully existing buildings outside town plans and outside settlement boundaries. Case β΄ of the paragraph, for buildings with derogations granted up to 31.12.2025, requires before the permit a positive opinion of the Central Architecture Council and a special fee of 5% of the objective value of the land. Whether these two also apply to the other cases of par. 3Α is not judged here.
  • Change of use to residence of buildings inside an approved plan or settlement. Under the last two sentences of par. 3 of Article 199 of the Code, as added by Law 5322/2026 (ΦΕΚ Α΄ 117/24.07.2026), a positive opinion of the Central Architecture Council is required before the building permit.

Preliminary approval and building permit

The Code distinguishes the preliminary approval (Article 314 case γ΄) from the building permit (Article 314 case α΄). The preliminary approval is as a rule optional (Article 321 par. 1; mandatory in the cases of pars. 2 and 3). Under Article 326 par. 1, where a preliminary approval has been issued, the documents submitted for it need not be submitted again.

Checklist

The opening phrase of Article 326 par. 1 (where required, under the legislation in force) applies to every case; the middle column shows only what the case itself carries; which items a project needs is judged project by project.

Document Reservation, alternative or exception in the text of the case Provision
Application with declarations of assignment and undertaking No reservation Article 326 par. 1 case α΄
Approvals of other services Where required Article 326 par. 1 case β΄
Titles, ownership certificate or cadastral sheet No reservation Article 326 par. 1 case γ΄
Proof of legality of existing buildings Of any existing buildings Article 326 par. 1 case δ΄
Architectural study with passive fire protection and accessibility Where required (at the end of the case, after the embedded studies) Article 326 par. 1 case ε΄
Structural study No reservation Article 326 par. 1 case στ΄
Electromechanical studies No reservation Article 326 par. 1 case ζ΄
Energy performance study No reservation Article 326 par. 1 case η΄
Time schedule study No reservation Article 326 par. 1 case θ΄
Plumbing and drainage study No reservation Article 326 par. 1 case ι΄
Active fire protection study Where required Article 326 par. 1 case ια΄
Approved fuel gas study No reservation Article 326 par. 1 case ιβ΄
Health and safety plan and file Where required under Presidential Decree 305/1996 Article 326 par. 1 case ιγ΄
Waste management data (Σ.Δ.Α.) Alternative: for regional units without an approved Σ.Σ.Ε.Δ. for Α.Ε.Κ.Κ., a solemn declaration of the manager Article 326 par. 1 case ιδ΄
Notarial declaration of parking or proof of buy-out Alternative: in a buy-out. Exception: the public properties of the structures and services of Law 4662/2020 Article 326 par. 1 case ιε΄
Explanatory report of Law 1577/1985 No reservation Article 326 par. 1 case ιστ΄
Proof of contributions Of the contributions required Article 326 par. 1 case ιζ΄
Receipt for designers’ fees No reservation Article 326 par. 1 case ιη΄
Survey plan with Cadastre code No reservation Article 326 par. 1 case ιθ΄
Coverage diagram No reservation Article 326 par. 1 case κ΄
Buy-out contribution form In a buy-out Article 326 par. 1 case κα΄

Related provisions of the Code:

Document or act When Provision
Written certificate of the Building Service with a solemn declaration of the designer Categories 1, 2 and 3 without a preliminary approval Article 324 par. 2 case β΄ sub-cases βα΄ and ββ΄
Concurring opinion of the Σ.Α. In the cases of par. 2 Article 464 par. 2
Decision approving an intervention under Law 998/1979 Counts as a preliminary approval Article 314 case γ΄
Initial approvals of other services taken into account in the approval of environmental terms In place of issuing them again, while the environmental terms are in force Article 326 par. 3

Sources

  1. Law 5306/2026 ratifying the Spatial and Urban Planning Code (ΦΕΚ Α΄ 88/08.06.2026) (PDF, in Greek)
  2. Law 4495/2017 Control and protection of the Built Environment and other provisions (ΦΕΚ Α΄ 167/03.11.2017) (PDF, in Greek)
  3. Law 5322/2026 (ΦΕΚ Α΄ 117/24.07.2026) (PDF in Greek)
Written by
Dimosthenis Kanelakis, Co-Founder & COO

An information tool, not legal advice. Professional responsibility remains with the engineer.

See Domicode in a live presentation